Services
Media Todays Services
Engineering & Automation System Design Implementation
Television News Channel
Entertainment Channel
Video Production House
Satellite TV Earth Station
DSNG and OB Van
FM Radio Station
CONSULTANCY ON
ALLOCATION OF
Air Conditioners and their duct
Return Path for Air Conditioning
Uninterrupted Power Supply (UPS)
Electrical Distribution Measurements
Services
Space & Floor Requirement for:
Raised floor for Cable Path
Placement Equipment Racks
Floor Load and Floor Depth
Technical Furniture's for:
PCR
MCR
Studio
Monitor Wall
Automation System
Editing Suite
C A R Room
Ingest Room
Transmission Room
Satellite Earth Station
Cabling and Electrical wiring for:
PCR
MCR
Studio
Monitor Wall
Automation System
Editing Suite
C A R Room
Ingest Room
Transmission Room
Satellite Earth Station
Automatic System
Operational lighting
Provide lighting above operational consoles and equipment control areas, where script lights will be used.
These light fittings utilize color corrected lamps with high frequency ballasts installed below ceiling level and cast low level beams of light.
Separate circuit so a section of lighting can be individually dimmed if necessary.
Installation
Cable Laying
Furniture Installations
Mechanical Installations
Assembling and Racking of Equipment
Cable Connector Fixing
Testing & Troubleshooting:
Testing of Automation system
Test For Individual Equipment's
Audio/Video Signal Path Test
Training on:
Operations of Individual Equipment's
Operations of Integrated Systems
Optimum Maintenance
Handing Over of :
Engineering Design
Engineering Operations
News Automation System